Vi has announced the completion of its network deployment along the entire East-West Metro corridor, offering uninterrupted connectivity for travelers across the 16.6-kilometer Green Line metro route.
This development comes as India inaugurates its first underwater metro service, a significant milestone for Kolkata.
Kolkata’s Underwater Metro Rail Service
This includes all 17 stations, covering a 10.8-kilometer underground stretch with 6 stations (Phool Bagan, Sealdah, Esplanade, Mahakaran, Howrah Station, Howrah Maidan), and 11 ground/elevated stations (Teghoria, Raghunathpur, Baguiati, Dum Dum Park, Kestopur, Salt Lake Sector V, Karunamoyee, Central Park, City Centre, Bengal Chemical, Salt Lake Stadium).
Among the elevated stations, Salt Lake Sector V, Karunamoyee, Central Park, City Centre, Bengal Chemical, and Salt Lake Stadium are accessible to the public, while the remaining 5 will open soon.
Vi has ensured complete network infrastructure deployment across all stations, including the challenging tunnel section, which lies 13 meters below the Hooghly riverbed and 33 meters beneath the surface level.
To ensure seamless connectivity, Vi has installed in-building solutions (IBS) inside the river tunnel and the underground metro tunnel.
Commenting on the completion of network deployment, Naveen Singhvi, Cluster Business Head – East, Vodafone Idea, said:
The inauguration of the East-West Metro corridor marks a long-awaited moment for the people of Kolkata and Howrah. As a prominent telecom operator, we are pleased to announce that our network deployment along this underwater rail route will deliver an uninterrupted, seamless, and superior network experience to our Vi customers. This initiative underscores Vi’s dedication to ensuring our customers enjoy a delightful experience, paving the way for a brighter future.